5.6 Row spacings 51
5.7 Mounting category 52
5.8 Working speed 52
5.9 Performance characteristics of
the tractor 52
5.10 Noise development data 53
5.11 Drivable slope inclination 53
5.12 Lubricants 54
5.13 Gear oil 54
5.14 Chain oil 54
6 Preparing the machine 55
6.1 Calculating the required tractor
characteristics 55
6.2 Adjusting the 3-point mounting
frame 58
6.2.1 Adjusting the 3-point mounting
frame for mounting category 2 58
6.2.2 Adjusting the 3-point mounting
frame for mounting category 3 58
6.3 Coupling the implement 59
6.3.1 Coupling the supply lines to the
hose package 59
6.3.2 Attaching the lower link ball sleeves 59
6.3.3 Attaching the top link ball sleeves 60
6.3.4 Coupling the universal joint shaft 60
6.3.5 Coupling the hydraulic hose lines 61
6.3.6 Coupling the ISOBUS line 63
6.3.7 Coupling the power supply 63
6.3.8 Coupling the 3-point mounting frame 64
6.3.9 Raising the jacks 64
6.3.10 Operation without front hopper 65
6.4 Preparing the implement for
operation 66
6.4.1 Adjusting the working position sensor 66
6.4.2 Filling the seed hopper 66
6.4.3 Filling the fertiliser hopper 68
6.4.4 Preparing the micropellet spreader
for operation 70
6.4.5 Determining the setting parameters 76
6.4.6 Adjusting the fan speed 78
6.4.7 Preparing the track marker for
operation 80
6.4.8 Preparing the wheel mark
eradicator for operation 88
6.4.9 Setting up the speed sensor on the
implement 90
6.4.10 Using the multi-placement tester 90
6.4.11 Adjusting the grain singling unit 92
6.4.12 Changing the seed spread rate 101
6.4.13 Adjusting the PreTeC coulter 114
6.4.14 Creating tramlines 128
6.4.15 Calibrating the electrically driven
fertiliser metering unit 129
6.4.16 Calibrating the mechanically driven
fertiliser metering 132
6.4.17 Changing the application rate for
liquid fertiliser 138
6.4.18 Adjusting the frame ballasting 140
6.4.19 Adjusting the placement depth on
the coupled fertiliser coulter 141
6.4.20 Adjusting the shifted tramline 142
6.4.21 Using the loading board 143
6.4.22 Adjusting the filling auger 144
6.4.23 Workshop work 145
6.5 Preparing the machine for road
travel 161
6.5.1 Folding in the track marker 161
6.5.2 Lifting the implement 163
6.5.3 Locking the tractor control units 163
6.6 Calculating the permissible
payload 164
7 Using the machine 165
7.1 Using the implement 165
7.2 Turning on the headlands 166
7.3 Checking the placement depth 166
7.4 Using the shifted tramline 166
8
Parking the machine 168
8.1 Emptying the fertiliser hopper 168
8.2 Emptying the seed hopper
through the singling disc 168
8.3 Emptying the seed hopper
through the residual quantity flap 171
MG6660-EN-II | D.1 | 27.09.2021
II