EasyManua.ls Logo

Assa Abloy TRAKA32 - Page 39

Assa Abloy TRAKA32
919 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
V3.5 14/08/19
UD0089
Page 39
This Document is uncontrolled unless over stamped "CONTROLLED DOCUMENT"
6. Disconnect the Green & Yellow Earth cable connector linking the Receptor Frame to the main cabinet.
7. Using a 2.5mm Allen Key, remove the screws holding the Receptor Frame in place.
8. Carefully slide the Receptor Frame to the right to free from the main cabinet and remove.
NOTE: The receptor frame is heavy especially when fully loaded with keys.
9. The above preparation will have now revealed the 6 fixing holes that can be used to fix the system to a
suitable wall with suitable fixings.
10. Now refer to the S-Series Installation section.

Table of Contents

Related product manuals