6. Disconnect the Green & Yellow Earth cable connector linking the Receptor Frame to the main cabinet.
7. Using a 2.5mm Allen Key, remove the screws holding the Receptor Frame in place.
8. Carefully slide the Receptor Frame to the right to free from the main cabinet and remove.
NOTE: The receptor frame is heavy especially when fully loaded with keys.
9. The above preparation will have now revealed the 6 fixing holes that can be used to fix the system to a
suitable wall with suitable fixings.
10. Now refer to the S-Series Installation section.