5. Using a 10mm Nut Spinner, carefully remove the top and bottom 1U blanking panels.
6. The above preparation will have now revealed 5 fixing holes.
7. You will find the following cables hanging in the back of the cabinet. Carefully thread these cables through the
pre-drilled hole in the right hand side of the cabinet.
Receptor Ribbon Cable
Door Switch/Solenoid Cable
Earth Cable
8. Now refer to the L-Series Pod Preparation section.