EasyManua.ls Logo

BD FACSCalibur - Daily Shutdown with the Loader

BD FACSCalibur
238 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
166 BD FACSCalibur Instructions for Use
5 Move the tube support arm to the side and allow the vacuum to aspirate
2 mL of DI water.
6 Move the support arm to the center and run the DI water on HI for
5minutes.
7 Leave the tube containing no more than 1 mL of DI water on the SIP.
8 Press STANDBY.
NOTICE To allow the laser to cool down, leave the instrument in
STANDBY for 5 minutes before you turn off the power.
9 Exit the software.
10 Turn off the instrument.
11 Shut down the computer.
Daily Shutdown with the Loader
A Long Clean is performed automatically at the end of each Worklist run. Do the
following when you stop a Worklist prematurely, or for additional optional
cleaning after an automatic clean. To skip cleaning, begin shutdown with step 8.
1 Set up a Loader rack with cleaning tubes; install the rack on the Loader.
Install a 12 x 75-mm tube of 3 mL cleaning solution in position 39, and a
tube of 3 mL DI water in position 40.
2 Install the Loader cover; press RUN.
3 Quit Worklist Manager, if running.
4 Launch Loader Manager software:

Table of Contents

Related product manuals