Chapter 8: Maintenance 179
Loader Maintenance
Maintenance
Procedure
Description When to Perform
Running a Long Clean Runs cleaning solution, then DI
water for approximately 12
minutes
See page 166.
When Worklist is stopped
before finished, or for
additional optional cleaning
Checking tube lifter
calibration
Displays lifter parameters
See page 180.
When needed for Loader
diagnostics or
troubleshooting
Verifying connection
ports
See page 181. When communication
errors observed
Replacing the Loader
seal
See page 182. When tube pressurization
issues occur
(Change the seal only after
trying all other solutions on
page 208.)
Cleaning the tube
lifter
See page 184. To correct a repeated
vertical timeout error
Modifying the
cytometer for non-
Loader use
See page 186. To use the cytometer
without the Loader