EasyManua.ls Logo

Bobcat S850 - Lifting the Loader - Four-Point Lift

Bobcat S850
210 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
98 S850 Operation & Maintenance Manual
OPERATING PROCEDURE (CONT’D)
Operating With A Full Bucket
Figure 142
Figure 143
With a full bucket, go up or down the slope with the heavy
e
nd toward the top of the slope [Figure 142] and
[Figure 143].
Operating With An Empty Bucket
Figur
e 144
Figure 145
With an empty bucket, go down or up the slope with the
he
avy end toward the top of the slope [Figure 144] and
[Figure 145].
Raise the bucket only high enough to avoid obstructions
on
rough ground.
NA1678
WITH BUCKET FULL
Going Up Slope
NA1679
WITH BUCKET FULL
Going Down Slope
NA1686
WITH BUCKET EMPTY
Going Down Slope
NA1687
WITH BUCKET EMPTY
Going Up Slope
100 of 210
Dealer Copy -- Not for Resale

Table of Contents

Related product manuals