MODEL-
182
&
T182
SERIES
SERVICE
MANUAL
b.
Remove
safety
wire,
relieve
cable
tension
at
place,
routed
through
structure;
then
at-
turnbuckles
(2)
and
disconnect
turnbuckle
eyes
at
tach
the
cable
being
installed
and
pull
cable
bellcrank
links
(3).
into
position.
c.
Disconnect
elevator
down-springs
(5)
at
bell-
f.
After
cable
is
routed
in
position,
install
pulleys
crank
(4).
and
cable
guards.
Ensure
cable
is
positioned
in
d.
Disconnect
push-pull
tube
(9)
at
bellcrank
(4).
pulley
groove
before
installing
guards.
e.
Remove
pivot
bolt
(10)
attaching
bellcrank
(4)
g.
Re-rig
system
in
accordance
with
paragraph
to
brackets
(8).
Remove
bellcrank.
8-14,
safety
turnbuckles
and
reinstall
all
items
f.
Reverse
the
preceding
steps
for
reinstallation.
removed
in
step
"a".
Rig
system
in
accordance
with
paragraph
8-14,
safety
turnbuckles
and
reinstall
all
items
removed
8-14.
RIGGING.
(See
figure
8-3.)
for
access.
8-10.
ARM
ASSEMBLY.
(See
figure
8-2.)
Position
a
support
stand
under
tail
tie-down
8-11.
REMOVAL
AND
INSTALLATION.
ring
to
prevent
the
tailcone
from
dropping
a.
Remove
stinger.
while
working
inside.
b.
Remove
bolt
(10)
securing
push-pull
tube
(11)
to
arm
assembly
(4).
a.
Streamline
elevators,
mount
an
inclinometer
on
c.
Remove
bolts
(13)
attaching
elevator
torque
tubes
one
elevator
and
set
to
0°.
(3)
to
arm
assembly
(4).
d.
Remove pivot
bolt
(12)
securing
arm
assembly
NOTE
(4)
and
slide
assembly
from
between
elevator
torque
tubes.
An
inclinometer
for
measuring
control
sur-
e.
Reverse
the
preceding
steps
for
reinstallation
face
travel
is
available
from
the
Cessna
and
reinstall
all
items
removed
for
access.
Supply
Division.
See
figure
6-4.
8-12.
CABLES
AND
PULLEYS.
(See
figure
b.
Lock
control
column
in
neutral
position
per
8-1.)
figure
8-5.
c.
Adjust
bellcrank
stop
blocks
(7)
at
brackets
(8)
8-13.
REMOVAL
AND
INSTALLATION.
to
degree
of
travel
specified
in
figure
1-1.
Position
a
support
stand
under
tail
tie-down
The
bellcrank
stop
blocks
(7)
are
four-sided
ring
to
prevent
the
tailcone
from
dropping
bushings,
drilled
off-center
so
they
may
be
while
working
inside.
rotated
to
any
one
of
four
positions
to
attain
correct
elevator
travel.
Each
90-degree
ro-
a.
Remove
seats,
upholstery
and
access
plates
as
tation
of
the
stop,
changes
the
elevator
travel
necessary.
approximately
one
degree.
b.
Remove
safety
wire
and
relieve
cable
tension
at
turnbuckles
(5).
d.
Adjust
turnbuckles
(2)
equally to
tension
specified
c.
Disconnect
cables
at
control
column
arm
assem-
in
figure
8-3
blies
(index
18,
figure
6-2).
e.
Check
sponge
at
control
column
in
both
UP
and
d.
Disconnect
cables
at
bellcrank
links
(index
3,
DOWN
positions
and
if
necessary,
readjust turn-
figure 8-3).
buckles
(2)
to
prevent
the
control
column
from
hitting
e.
Remove
cable
guards
and
pulleys
as
necessary
the
instrument
panel
or
firewall.
to
work
cables
free
of
aircraft.
f.
Safety
turnbuckles
and
reinstall
all
items
re-
NOTE
moved
for
access.
NOTE
To
ease
routing
of
cables,
a
length
of
wire
may
be
attached
to
the
end
of
cable
being
Be
sure
elevators
move
in
the
correct
direc-
withdrawn
from
aircraft.
Leave
wire
in
tion
when
operated
by
the
control
wheel.
SHOP
NOTES:
8-6

Table of Contents