EasyManua.ls Logo

GBC AdvancedPunch - Unpacking; Test Operation

GBC AdvancedPunch
244 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and Set Up
Advanced Punch Service Manual © Copyright 2009 GBC. All rights reserved. 8-11
8.3 Unpacking
Inspect the outside of the package for shipping damage. If there is evidence of
shipping damage, contact the shipping carrier immediately.
Remove the punch from its shipping carton.
Inspect for any concealed damage to unit. If there is evidence of concealed
shipping damage, contact the shipping carrier immediately.
Remove all shipping tape from doors and levers.
8.4 Test Operation
Check to ensure that the paper chip tray is securely in place.
Check to ensure that a Die Set is installed properly and that any extra Die
Sets are securely stored in the Die Storage Area.
Run a small test job in Bypass mode. Check to ensure that the job is not
punched and bypasses properly.
Run a small job with Punch Enabled. Check the punched holes of the job.
Ensure the paper output is stacking properly.
Ensure the hole quality of the sheet output is proper

Table of Contents

Related product manuals