Repair and Adjustment Procedures
Advanced Punch Service Manual © Copyright 2009 GBC. All rights reserved. 4-25
Figure 4.25 Installing J2 Shaft.
8. Close the Flipper Latch.
Repeat the test of rotating the pulleys to ensure smooth rotation of the Idler
Rollers.
9. Attach the Shaft Spring.
10. Install the front E-Ring to secure.
INSTALL J2 SHAFT
ASSEMBLE BACK