EasyManua.ls Logo

GE Datex-Ohmeda S/5 Series - Before Beginning; Visual Inspection

GE Datex-Ohmeda S/5 Series
335 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Datex-Ohmeda S/5 Compact Anesthesia and Compact Critical Care Monitors
12
Document no. M1144958-001
3.2.3 Before beginning
Make sure that the monitor is switched to standby.
Disconnect the power cord and press the service reset switch until the LED next to it turns
off.
If the monitor is connected to the Datex-Ohmeda Network, disconnect the Mon-Net
cable. Take out any memory cards, if installed.
Remove the AC/DC Power Unit.
Disassemble the Side Frame Unit.
Detach the battery cables from the Power Management Board.
3.2.4 Visual inspection
1. Side Frame Unit
Check the Side Frame Unit:
screws are tightened properly
cables are connected properly
connectors are clean and intact
"
2. PMB and the Connector Boards
Check the Frame Unit from inside. Check the PMB and the Connector Boards:
there are no loose objects inside the Frame Unit
all screws are tightened properly
all connectors are clean and intact
cables are connected properly
"
3. Frame Unit reattached
Reconnect the battery cable.
Reattach the Side Frame Unit.
Reattach the Frame Unit back plate.
Reattach the AC/DC power unit.
"
NOTE: Make sure that all insulation plates are placed correctly before reattaching the rear
cover.
4. Battery slot
Internal parts under bottom cover
Detach the bottom cover and check internal parts:
the battery cable is connected properly

Table of Contents

Related product manuals