2. Insert four guide pins on the 2-SMP connection board or eight guide pins
on the 4-SMP connection board into the holes in the server blades until
the gap between the SMP connection board and blades becomes about 10
mm with the lever fully open.
3. Close a lever to the lever latched.
Figure 5-7 Installing 2-blade SMP connection board
5-10
Replacing parts
Hitachi Compute Blade 500 Series System Service Manual