EasyManua.ls Logo

Hitachi CB 520H B3 - Page 331

Hitachi CB 520H B3
466 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12. Select Return to Previous Page by using ↓ and ↑ keys, and then press
Enter.
13. Confirm the slot number and the port number of failed mezzanine card. In
addition, record the value of WWN.
Select Emulex nnn line for the failed mezzanine card slot #, where nnn is
even number, in Storage window by using ↓ and ↑ keys, and then press
Enter.
Note: A half wide server blade can install a mezzanine card in slot 2.
A full wide server blade can install two mezzanine cards in slot 2 and slot
4.
Configuring Emulex mezzanine card
7-37
Hitachi Compute Blade 500 Series System Service Manual

Table of Contents

Other manuals for Hitachi CB 520H B3

Related product manuals