CHAPTER 4
Site Preparation
•
Site Preparation Checklist for the Junos Pulse Gateway on page 27
•
General Site Guidelines for Installing the Junos Pulse Gateway on page 28
•
Junos Pulse Gateway Electrical and Power Requirements on page 29
Site Preparation Checklist for the Junos Pulse Gateway
The checklist in Table 18 on page 27 summarizes the tasks you need to perform to prepare
a site for installing the Junos Pulse Gateway.
Table 18: Site Preparation Checklist for the Junos Pulse Gateway
Installation
Date and NotesAdditional InformationItem or Task
Environment
Junos Pulse Gateway
Environmental Specifications
Verify that environmental
factors such as temperature
and humidity do not exceed
device tolerances.
Power
“Junos Pulse Gateway
Electrical and Power
Requirements” on page 29
•
Measure the distance
between the external power
sources and device
installation site.
•
Locate sites for connection
of the system grounding.
Rack and Cabinet Installation
“Junos Pulse Gateway Rack
Requirements” on page 31
“Junos Pulse Gateway Cabinet
Requirements” on page 32
•
Verify that your rack meets
the minimum requirements.
•
Plan rack location, including
required space clearances.
•
Secure the rack to the floor
and building structure.
Desktop Installation
27Copyright © 2014, Juniper Networks, Inc.