Figure 158: Installing an SCB
OK
0
FAIL
ONLINE
OK
1
FAIL
ONLINE
OK
2
FAIL
ONLINE
OK
3
FAIL
ONLINE
OK
4
FAIL
ONLINE
OK
5
FAIL
ONLINE
OK
0
FAIL
ONLINE
MASTER
ONLINE
OFFLINE
RE0
FAN
PEM
1
0
0
1
2
3
RE1
OK
1
FAIL
ONLINE
OK
7
FAIL
ONLINE
OK
8
FAIL
ONLINE
OK
9
FAIL
ONLINE
OK
10
FAIL
ONLINE
OK
11
FAIL
ONLINE
OK
2
6
FAIL
ONLINE
ACO/LT
YELLOW ALARM
RED ALARM
NC
NO
C
NC
NO
C
1
0
1
0
1
0
1
0
1
0
1
1
0
0
1
0
1
0
1
0
g004049
Upgrading an MX240 SCB
1.
Preparing for the Upgrade on page 359
2.
Upgrading the SCB in the Backup Routing Engine on page 361
3.
Upgrading the SCB in the Master Routing Engine on page 363
4.
Completing the SCB Upgrade on page 365
Preparing for the Upgrade
NOTE: Do not make other changes to the CLI during the entire upgrade
process. You can ensure that you will not make such changes by opening a
telnet sessionto the masterRE CLIoperational modeand issuingthe configure
exclusive command. This command locks the configuration procedure.
TIP: To prevent traffic loss during the upgrade process, we recommend that
you operate the line cards at 50% line rate. This 50% limit must be
maintained per PFE on each line card.
359Copyright © 2017, Juniper Networks, Inc.
Chapter 27: Replacing Switch Fabric Components