7 Operation
7.1 Initial operation
Page 70 Docu-No.: 1090020601-EN Rev. 1.2.1
7 Operation
7.1 Initial operation
Be sure that all wiring has been correctly completed.
Verify that all equipment is properly installed and secure.
Power the KCM and separate user interface if provided
Verify the KCM or other display executes its start-up sequence.
Refer to the appropriate manual for either programming or running
the KCM controller.
▲ Do not open the KCM unless power has been removed and no
explosive atmosphere is present.
▲ Allow 3 minutes for power to dissipate prior to opening the
enclosure.
▲ Do not operate machinery unless all guards are in place and all
safety checks have been made.
▲ Keep people away from the machine while in operation.
▲ The KCM must only be installed, wired, programmed and put into
service by authorized personnel.
▲ The user must be trained in operation of the KCM control system
prior to first operation.
▲ Skills to operate and service the equipment can be gained through
the K-Tron Institute.