Preparing the Installation
5
1.4 Selecting and Preparing a Site for Installation
When selecting an installation location consider the following points:
The inverter must be installed on a wall that can support the inverters weight.
The location must be free from vibration. Vibration can adversely affect the operation of the
inverter.
The inverter can become very hot during operation. Install the inverter on a surface that is
fire-resistant or flame-retardant and with sufficient clearance around the inverter to allow air
to circulate. The illustrations below detail the required installation clearances.