EasyManuals Logo

LSIS XEC-DP64H User Manual

LSIS XEC-DP64H
315 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #178 background imageLoading...
Page #178 background image
Chapter 5 Positioning Instructions
5 - 79
(b) Program Operation
•At the rising edge of the ‘Y-axis speed synchronization’ signal used as the speed synchronization
reference signal, the APM_SSSB instruction is executed. Here, since the AXIS is 1 (Y-axis), Y-axis
is the sub-axis and as the MST_AXIS is 0 (X-axis), X-axis is the main axis.
•At the rising edge of the ‘indirect start-up’ signal which is the indirect start-up reference signal, the
No. 1 step of the X-axis starts indirectly.
•When the main axis starts up, Y-axis is started-up at the synchronization ratio of 100.00[%] set up in
the third operand of the APM_SSSB instruction and synchronized to the main axis by 10[ms] of
delay time.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LSIS XEC-DP64H and is the answer not in the manual?

LSIS XEC-DP64H Specifications

General IconGeneral
BrandLSIS
ModelXEC-DP64H
CategoryController
LanguageEnglish

Related product manuals