EasyManua.ls Logo

Lucent Technologies FiberReach DDM-2000 - Page 1497

Lucent Technologies FiberReach DDM-2000
1896 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
363-206-305 Detailed Level Procedure:
DLP-501
Issue 3, June 2000 Page 3 of 6
DDM-2000 F
IBER
R
EACH
W
IDEBAND
S
HELF
!
CAUTION:
The UPD/INT pushbutton on the SYSCTL is recessed to prevent its
accidental operation. You will need a small pointed object, such as a
ballpoint pen, to operate it.
Read the remainder of Steps 6 and 7 before installing the SYSCTL, then
seat the SYSCTL.
If the following responses do not occur, proceed to Step 8.
Response: FAULT LED on BBG8/BBG8B SYSCTL lights and ABN
LED on the User Panel lights after approximately 5
seconds. MJ and NE may light or flash briefly. FAULT
LED on the SYSCTL goes off after approximately 5
seconds. ABN LED goes off after approximately 15
seconds. Approximately 1 minute and 30 seconds after
the ABN goes off, the CR LED on the User Panel begins
to flash.
7. Momentarily depress the UPD/INIT button on the SYSCTL while the CR LED
is flashing (you have 10 SECONDS to do this).
If the following responses do not occur, continue with Step 8.
Response: CR LED on the User Panel stops flashing when the
UPD/INIT button is pressed.
ABN LED on the User Panel lights after approximately 15
seconds. ABN goes off after approximately 30 seconds.
Approximately 1 minute and 45 seconds after the ABN
LED goes off, the CR LED on the User Panel flashes
again. DO NOT depress UPD/INIT pushbutton again
when the CR LED flashes.
All red LEDs on all circuit packs in the DDM-2000 should
be off. Any red LEDs remaining on or flashing represent a
failure condition.
Initialization may take 2-3 minutes.

Table of Contents

Related product manuals