MAN B&W 19.01
Page 2 of 2
MAN Diesel
MAN B&W ME/ME-B/MEC/MEGI engines 198 42 270.3
MAN Diesel’s recommendations for shop trial,
quay trial and sea trial are available on request.
An additional test is required for measuring the NO
x
emissions, for plants with FPP or CPP, EoD 4 06
060a or 4 06 060b respectively.
Spare Parts
List of spares, unrestricted service
The tendency today is for the classication societ-
ies to change their rules such that required spare
parts are changed into recommended spare
parts.
MAN Diesel, however, has decided to keep a
set of spare parts included in the basic extent
of delivery (4 87 601 and 4 87 602) covering the
requirements and recommendations of the major
classication societies, see Section 19.06.
This amount is to be considered as minimum
safety stock for emergency situations.
Additional spare parts recommended by
MAN Diesel
The abovementioned set of spare parts can be
extended with the ‘Additional Spare Parts Recom-
mended by MAN Diesel’ (option: 4 87 603), which
facilitates maintenance because, in that case, all
the components such as gaskets, sealings, etc.
required for an overhaul will be readily available,
see Section 19.07.
Wearing parts
The consumable spare parts for a certain period
are not included in the above mentioned sets, but
can be ordered for the rst 1, 2, up to 10 years’
service of a new engine (option: 4 87 629), a ser-
vice year being assumed to be 6,000 running
hours.
The wearing parts supposed to be required, based
on our service experience, are divided into 14
groups, see Table A in Section 19.08, each group
including the components stated in Tables B.
Large spare parts, dimensions and masses
The approximate dimensions and masses of the
larger spare parts are indicated in Section 19.09.
A complete list will be delivered by the engine
maker.
Tools
List of standard tools
The engine is delivered with the necessary special
tools for overhauling purposes. The extent, di-
mensions and masses of the main tools is stated
in Section 19.10. A complete list will be delivered
by the engine maker.
Tool Panels
Most of the tools are arranged on steel plate pan-
els (EoD 4 88 660) see Section 19.11 ‘Tool Panels’.
It is recommended to place the panels close to the
location where the overhaul is to be carried out.