EasyManuals Logo
Home>Planet>Switch>GS-4210 SERIES

Planet GS-4210 SERIES User Manual

Planet GS-4210 SERIES
353 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #41 background imageLoading...
Page #41 background image
User’s Manual of GS-4210 Series
3. SWITCH MANAGEMENT
This chapter explains the methods that you can use to configure management access to the Managed Switch. It describes the
types of management applications and the communication and management protocols that deliver data between your
management device (workstation or personal computer) and the system. It also contains information about port connection
options.
This chapter covers the following topics:
Requirements
Management Access Overview
Administration Console Access
Web Management Access
SNMP Access
Standards, Protocols, and Related Reading
3.1 Requirements
Workstations running Windows 2000/XP, 2003, Vista/7/8, 2008, MAC OS9 or later, Linux, UNIX or other platforms
are compatible with TCP/IP protocols.
Workstation is installed with Ethernet NIC (Network Interface Card).
Serial Port connect (Terminal)
The above PC comes with COM Port (DB9 / RS-232) or USB-to-RS-232 converter
Ethernet Port connection
Network cables -- Use standard network (UTP) cables with RJ45 connectors.
The above Workstation is installed with Web browser and Java runtime environment plug-in.
It is recommended to use Internet Explore 8.0 or above to access Managed Switch.
41

Table of Contents

Other manuals for Planet GS-4210 SERIES

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Planet GS-4210 SERIES and is the answer not in the manual?

Planet GS-4210 SERIES Specifications

General IconGeneral
BrandPlanet
ModelGS-4210 SERIES
CategorySwitch
LanguageEnglish

Related product manuals