Maintenance
6.4.1 Intervention table
AFTER THE FIRST 10 HOURS OF OPERATION
Complete machine Check all bolts and nuts
See par. “6.5.1” pag. 110
See par. “6.8.3” pag. 124
See par. “6.10.6” pag. 132
Hydraulic system
Check the tightness of the hydraulic hose con-
nections
See par. “6.6.1” pag. 112
Check possible oil leaks See par. “6.6.2” pag. 112
EVERY 10 HOURS
Complete machine Cleaning the machine See par. “6.5.2” pag. 111
Wheels
Wheel hub lubrication See par. “6.8.1” pag. 122
Wheel jack pin lubrication See par. “6.8.2” pag. 123
Hydraulic system Check possible oil leaks See par. “6.6.4” pag. 114
Electrical system Emergency stop button efficiency check See par. “6.9.1” pag. 125
Vibrating head
Visual check of the state of wear -
Greasing of the vibration kinematics (eccentric
masses)
See par. “6.10.1” pag. 126
Greasing of jack pins and jaws See par. “6.10.2” pag. 128
Greasing of the tilting hydraulic cylinder pins See par. “6.10.3” pag. 129
Greasing of the jack pins for transversal inclina-
tion (tilting) and spider
See par. “6.10.4” pag. 130
Greasing of the chain supporting the vibrating
head
See par. “6.10.5” pag. 131
107
SICMA S.r.l.