6 Carrier (19", card cage) with two installed card cages (5 slots)
7 Carrier (19", card cage) with one installed card cage (5 slots) and DIN rails
8 Carrier (19", card cage)
9 Carrier (19", option)
A First power supply group with carrier (19", power supply) and battery tray (19") with batteries.
● Carrier (19", power supply) must be installed in the highest possible position.
● Battery tray (19") with batteries must be installed in the lowest possible position.
B Second power supply group with carrier (19", power supply) and battery tray (19") with batteries.
● Carrier (19", power supply) must be installed directly below the first carrier.
● Battery tray (19") with batteries must be installed above the first battery tray.
C Processor unit (19", FC2080) must be installed at the top.
D Free installation space for card cages, additional devices and relays
!
When installing a second power supply group, the free installation space for card cages etc. is
reduced according to the battery size.