Phase IV – Filling
After the holding phase, the product is temporarily stored in a filling tank. From there, it is filled
into bulk tank trucks or small packing drums.
Phase V – Cleaning
The reactors, piping, valves, actuators, holding tank, and filling tank can be cleaned by a
cleaning-in-place (CIP) system. The resulting wastewater is collected in a separate effluent
tank and disposed.
5.1.2 Task list for Getting Started
Specific Configuration Task
You will now configure part of Phase I – Raw Materials:
Specifically, you will configure the storage of the liquid raw materials in two raw material tanks
and the pump control used to pump these raw materials to the two reactors.
Initial work for the project
5.1 Planning the project
PCS 7 SMART Getting Started - Part 1 (V9.0 with APL)
28 Getting Started, 12/2017, A5E42181435-AA