EasyManua.ls Logo

Siemens SIMATIC PCS 7 SMART - Procedure

Siemens SIMATIC PCS 7 SMART
210 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.2 Procedure
8.2.1 Compiling and Downloading CFC and SFC charts
Introduction
You have already created the CFC and SFCs for your "color_gs" project. These charts must
be compiled and loaded in a CPU for the automation functions to be executed by the AS. The
compile and download operation are started in a common dialog box and run one after the
other.
Prerequisites
The CPU is in "STOP" mode.
The color_gs project is open in SIMATIC Manager.
The Component view is activated.
Procedure
1. Select the "color_gs_prj_MP\color_gs_prj_Prj\SIMATIC 400(1)" folder in the tree view.
2. Select PLC > Compile and Download Objects.
The "Compile and Download Objects" dialog box opens.
Compiling, downloading and testing the charts
8.2 Procedure
PCS 7 SMART Getting Started - Part 1 (V9.0 with APL)
130 Getting Started, 12/2017, A5E42181435-AA

Table of Contents

Related product manuals