Result
At this point, you will not see any evident results of this function. You can see the generated
block icons only when you open the process picture for the "color_gs" project .
Note
If an MS Office message appears during the generation and wants to install something, cancel
the messages. The generation then continues.
9.4.2.4 Compiling the OS
Introduction
Before configuring the data in the OS, you have to compile the OS. With this function, all the
data from SIMATIC Manager, such as variables, messages, texts, hardware, and connection
configurations are "made known" to the OS. Do not confuse compiling with downloading: When
you compile, the data remains on the engineering system computer. It is simply made known
to the OS so that you can access this data during configuration.
Prerequisites
The color_gs project is open in SIMATIC Manager.
The Component View is activated.
Procedure
1. Select the "color_gs_prj_MP\color_gs_prj_Prj\ [Name of the SIMATIC PC-Station]" item in
the tree view.
2. Select PLC > Compile and Download Objects....
The "Compile and Download Objects" dialog box opens.
3. Open the tree view and select the "Compile" check box for the "OS(1)" object.
4. Select the "OS(1)" object and click "Edit".
Configuring the operator station
9.4 Working in the SIMATIC Manager
PCS 7 SMART Getting Started - Part 1 (V9.0 with APL)
Getting Started, 12/2017, A5E42181435-AA 147

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIMATIC PCS 7 SMART and is the answer not in the manual?

Siemens SIMATIC PCS 7 SMART Specifications

General IconGeneral
BrandSiemens
ModelSIMATIC PCS 7 SMART
CategoryControl Systems
LanguageEnglish

Related product manuals