Loading...
Commissioning
4.4 Creating a project offline in Startdrive
Commissioning with Startdrive
Commissioning Manual, 11/2017, 6SL3097-4AA10-0BP1
109
4. If a drive object type is set for the "VECTOR" module, it is possible to set further
additional data.
Select the menu "Power Module Details > Power Module Additional Data" in the inspector
window.
5. Select a desired filter in the "Output filter" drop-down list.
Additional display or entry fields are now overlaid in accordance with the respective filter
selected.
Figure 4-25 Example: Power Module Additional Data
Now record the respective detail settings for the selected filter.
Result
You have performed the detail settings for a selected Power Module or Motor Module.
4.4.5.4
Connecting several modules in parallel
In Startdrive, several Power Modules or several Motor Modules respectively can be
connected in parallel in vector control. During commissioning, power units connected in
parallel are treated like a power unit on the line or motor side. With parallel connection, the
parameter display for the actual values changes only slightly. Suitable "total values" are
derived from the individual values of the power units.
Functionality of the parallel connection is identical for Motor Modules and Power Modules.