Commissioning
4.4 Creating a project offline in Startdrive
Commissioning with Startdrive
132 Commissioning Manual, 11/2017, 6SL3097-4AA10-0BP1
4.4.8.3
Adding a Terminal Board
Requirement
A project has been created.
A Control Unit is contained in the device configuration.
No Communication Board CBE20 is contained in the device configuration.
TB30 and CBE20 cannot be created simultaneously in the device configuration.