EasyManua.ls Logo

Siemens SINAMICS S120 - Inserting Additional System Components; Adding a CBE20 Communication Board

Siemens SINAMICS S120
438 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
4.4 Creating a project offline in Startdrive
Commissioning with Startdrive
Commissioning Manual, 11/2017, 6SL3097-4AA10-0BP1
129
4.4.8
Inserting additional system components
Various system components can be inserted (additionally) in the device configuration of your
drive:
CBE20 Communication Board
Terminal Module
Terminal Board
VSM10 Voltage Sensing Module
Since the handling of these system components differs when inserting, the insertion
procedure is described separately in the following for each system component.
4.4.8.1
Adding a CBE20 Communication Board
Requirement
A project has been created.
A Control Unit is contained in the device configuration.
No Terminal Board TB30 is contained in the device configuration.
TB30 and CBE20 cannot be created simultaneously in the device configuration.

Table of Contents

Other manuals for Siemens SINAMICS S120

Related product manuals