Diagnostics
5.2 Diagnostics using LEDs
Commissioning with Startdrive
Commissioning Manual, 11/2017, 6SL3097-4AA10-0BP1
325
Table 5- 26 Meaning of the OPT LED on the Control Unit
LED
Color
Status
Description, cause
Remedy
OPT OFF The electronics power supply is missing or outside the
permissible tolerance range.
CBE20 either defective or not inserted.
Green Continuous
light
CBE20 is ready and cyclic communication is taking place.
Flashing
light
0.5 Hz
CBE20 is ready but cyclic communication is not running.
Possible causes:
Communication is being established.
At least one fault is present.
Red Continuous
light
Cyclic communication via PROFINET has not yet been
established. However, non-cyclic communications are
possible. SINAMICS is waiting for a parameteriza-
tion/configuration telegram.
Flashing
light
0.5 Hz
The firmware update into the CBE20 has been completed
with an error.
Possible causes:
The memory card for the control unit is defective.
The CBE20 is defective.
In this state CBE20 cannot be used.
Flashing
light
2 Hz
There is a communications error between the Control Unit
and the CBE20.
Possible causes:
The CBE20 was withdrawn after booting.
The CBE20 is defective.
Correctly insert the
board, if required,
replace.
Orange Flashing
light
0.5 Hz
Firmware of the CBE20 currently being updated.