EasyManua.ls Logo

Steris Reliance EPS Endoscope Processing System - Page 135

Steris Reliance EPS Endoscope Processing System
168 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-18
920011-649 Operator Manual Routine Maintenance
9. Press START touch pad. Display shows:
alternating with:
10. Confirm endoscopes are not present within endoscope
processing support.
11. Press START touch pad to start D-LONG cycle. Processor
automatically proceeds through programmed phases of
D-LONG cycle. Display shows:
12. During WASH phase of D-LONG cycle, CIP 200
®
Acid-Based
Process and Research Cleaner is injected into chamber at a
concentration of 16 mL/L (2 oz/gal).
13. At end of cycle, processor drains for 20 seconds. After
draining phase is completed, a buzzer sounds and display
shows:
14. Press UNLOCK toggle switch to unlock processor door. Open
door.
15. Check debris screen for debris. Rinse screen under running
water if necessary. Rinse while it is still wet, before any debris
dries. Reinstall screen.
REMOVE ALL
ENDOSCOPES
PRESS START
WHEN READY
OPERATING
MM
M MIN
CYCLE COMPLETE
READY TO UNLOAD
WARNING CHEMICAL BURN
AND/OR EYE INJURY HAZARD:
CIP 200 Acid-Based Process
and Research Cleaner is
corrosive and can cause
adverse effects to exposed
tissues. Do not get in eyes, on
skin or swallow. Read and
follow all precautions and
instructions on cleaner label
and in Safety Data Sheet
(SDS) prior to handling CIP
200 Acid-Based Process and
Research Cleaner Bag-in-a-
Box container or servicing
cleaner injection pump. Wear
appropriate Personal Protective
Equipment (PPE) whenever
handling cleaner or servicing
cleaner injection pump and
lines.

Table of Contents

Related product manuals