6-17
Routine Maintenance Operator Manual 920011-649
6.11 D-LONG Cycle Thirty hours after last decontamination cycle (D-SHORT or D-LONG)
has been processed, display shows:
-- or --
If a decontamination cycle is not completed before countdown
reminder reaches "0", control is locked until a D-LONG cycle is
performed. An endoscope processing cycle cannot be started until a
D-LONG cycle is performed. Display shows:
Decontaminate chamber as follows, using D-LONG cycle:
1. Press UNLOCK toggle switch to unlock chamber door. Open
door.
2. Pull endoscope processing support out of chamber.
3. Open control handle boots "A" and "B". Ensure endoscopes are
not present in control handle boots. Close boots and hang
buckle of middle latch on each boot, but do not clasp.
4. Ensure baskets, valve irrigators and pegs are empty of any
endoscope accessories and Flow Units.
5. Open Reliance CDS. Ensure a Reliance dry chemistry container
IS NOT
present in Reliance CDS. Close Reliance CDS cover but
do not clasp.
6. Push endoscope processing support inside chamber.
7. Close chamber door.
8. Press DECONTAM touch pad until display shows:
D-SHORT REQUIRED
XX HOURS LEFT
D-SHORT REQUIRED
XX MINUTES LEFT
D-LONG
REQUIRED NOW
D-LONG
PRESS START
CAUTION – POSSIBLE EQUIPMENT
DAMAGE: Remove all
endoscopes, accessories and
Flow Units from control
handle boots, accessory pegs,
valve irrigators, large mesh
basket or accessory basket
before performing a D-SHORT or
D-LONG cycle. Endoscopes,
accessories and Flow Units will
be damaged by decontamination
cleaner and/or high temperature.