4-40
920011-649 Operator Manual Processing Instructions
4.9.1 VERIFICATION 1 –
Parametric Controls
NOTE: For a 50 Hz processor, refer to Operator Manual Information
Supplement (P920501-322) for specific information.
After the processing cycle is completed:
1. Verify display shows:
Printer records a complete cycle printout (see Figures 4-24 and
4-25 to view an example of a typical printout). The following
information is also recorded on printout:
===========================
= READY TO UNLOAD =
===========================
This printout means cycle is successfully completed.
IMPORTANT: If cycle was interrupted by a fault or not completed
successfully (refer to S
ECTION 7, TROUBLESHOOTING), endoscope(s)
must be processed again through another cycle, with a new dry
chemistry container and chemical indicator.
2. Press UNLOCK toggle switch to unlock and open processor
door. Printer records:
===========================
DOOR OPEN HH:MM:SS XM
===========================
3. Pull endoscope processing support out of chamber.
4. Verify bottom of sump for absence of water. If water is still
present, refer to S
ECTION 7, TROUBLESHOOTING.
CYCLE COMPLETE
READY TO UNLOAD