4-39
Processing Instructions Operator Manual 920011-649
If DUPLICATE PRINTOUT feature is enabled in Miscellaneous
Values menu of Supervisor mode (refer to SECTION 5.2.3, SETTING
MISCELLANEOUS VALUES, for setting procedure), display shows:
5. Press SCROLL arrows (up or down) to choose (YES; generates
a duplicate of last cycle printout) or (NO; do not generate a
duplicate of last cycle printout).
NOTE: If MULTIPLE PRINTOUTS feature is enabled,
the
duplicated printout(s) is (are) recorded at the end of all printouts.
Header is identified as follows:
========================
DUPLICATE PRINT # X/X
========================
6. Press ALARM REPLY touch pad to silence audible alarm.
Proceed with SECTION 4.9, PROCESS VERIFICATION AND UNLOADING
PROCEDURE.
4.9 Process
Verification and
Unloading Procedure
Reliance EPS Processor provides the operator with methods of
quality assurance monitoring and allows for immediate parametric,
process and physical verification of the cycle.
IMPORTANT: Good Hospital Practice dictates processing of all
endoscopes be verified after high level disinfection in the Reliance
EPS. Should any processing cycle fail verification, endoscope(s)
must be reprocessed in another cycle.
Parametric controls are performed by the Reliance EPS
Processor to ensure each cycle meets specifications and cycle
data is documented on the printed tape (see Figures 4-24 and 4-
25).
Process verification is achieved through use of a STERIS
chemical indicator and fresh dry chemistry container detection
meter.
Physical verification of the process is performed by the operator.
The operator must ensure all process parameters were acceptable
as explained in S
ECTION 4.9.1, VERIFICATION 1 PARAMETRIC
CONTROLS, through SECTION 4.9.3, VERIFICATION 3 PHYSICAL.
IMPORTANT: Processing verification must be performed within
five minutes after opening the chamber door.
IMPORTANT: Use S
ECTION 4.11, POST-PROCESSING CHECKLIST, to
ensure all verification steps are completed as described in
S
ECTION 4.9.1, VERIFICATION 1 PARAMETRIC CONTROLS, through
S
ECTION 4.9.3, VERIFICATION 3 PHYSICAL.
DUPLICATE PRINT
YES
WARNING INEFFECTIVE
PROCESS HAZARD:
Correct function of the
system is only ensured
after any diagnosed errors
have been found,
corrected and a successful
processing cycle has been
completed.
When uncertain about any
endoscope processing
cycle, reprocess load.