EasyManuals Logo

Tektronix GeoProbe G10 User Manual

Tektronix GeoProbe G10
162 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #125 background imageLoading...
Page #125 background image
G10 Hardware Maintenance Guide 7.13.2 125
5
Maintenance Guidelines
Rev. 002-140228
7. Power off the storage arrays:
Power off the controller enclosure first and then the expansion
enclosures.
Press the power switches to the OFF position on both power modules at the
back of each enclosure.
STORAGE ARRAY MAINTENANCE PROCEDURES
This section contains the following procedures:
Replacing a Power Supply
Bezel (Air Filter) Procedures
Replacing a Controller or Expansion Module
Replacing a Drive Module
Replacing the Disk Array Chassis
Electrostatic discharge can damage circuits or shorten their life. Before touching blade or
electronic components, make sure that you are working in an ESD-safe environment and
wearing an ESD wrist or foot strap.
Storage Array Maintenance Guidelines
The G10 supports the following storage enclosures:
RAID: SA100R or SA200R
JBOD: SA100J, SA200J, SA210J
Please note the following guidelines when maintaining the storage arrays:
An SA200 part must be replaced with an SA200 part.
SA100 controllers can be replaced by SA200 controllers in an SA100 enclosure. Both
controllers must be replaced; you cannot mix controller models (one enclosure cannot
have one SA100 controller and one SA200 controller).
SA100 parts are not compatible with the SA200 enclosure.
Tektronix Communications | For Licensed Users | Unauthorized Duplication and Distribution Prohibited

Table of Contents

Other manuals for Tektronix GeoProbe G10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tektronix GeoProbe G10 and is the answer not in the manual?

Tektronix GeoProbe G10 Specifications

General IconGeneral
BrandTektronix
ModelGeoProbe G10
CategoryAccessories
LanguageEnglish