D26292
LockProjecting Part
A
41–8
–MANUAL TRANSMISSION/TRANSAXLE FLOOR SHIFT CABLE TRANSMISSION CONTROL
SHIFT
2138Author: Date:
2002 CAMRY REPAIR MANUAL (RM881U)
(e) Connect the shift cable to the shift lever retainer.
NOTICE:
The projecting part of the cable outer should face up-
ward when the shift cable is installed.
Make sure that after installation the cable outer lock
is projecting from A shown in the illustration.
(f) Install the top of the shift cable to the shift lever assy.
(g) Connect the shift cable to the control cable bracket and
install a new clip.
(h) Connect the shift cable to the transaxle and install the
washer and clip.
6. INSTALL AIR BAG SENSOR ASSY CENTER
(See page 60–56)
7. INSTALL AIR CONDITIONING RADIATOR ASSY
(See page 55–29)
8. INSTALL INSTRUMENT PANEL SAFETY PAD SUB–ASSY
(See page 71–12)
9. INSPECT SRS WARNING LIGHT(See page 05–690)