ENGINE REMOVAL
5-3
EAS23710
ENGINE REMOVAL
Removing the exhaust pipe assembly and muffler
Order Job/Parts to remove Q’ty Remarks
Rider seat/Side cowlings/T-bar
Refer to “GENERAL CHASSIS” on page
4-1.
Fuel tank Refer to “FUEL TANK” on page 7-1.
Coolant
Drain.
Refer to “CHANGING THE COOLANT” on
page 3-27.
Radiator Refer to “RADIATOR” on page 6-1.
1
O
2
sensor coupler
1 Disconnect.
2 Left muffler 1
3 Right muffler 1
4 Muffler protector 1
5Gasket 2
6 Exhaust pipe assembly 1
7Gasket 4
For installation, reverse the removal proce-
dure.
6
4
7
(8)
2
1
3
New
5
New
5
New
T
R
.
.
20 Nm (2.0 m
•
kg, 14 ft
•
Ib)
T
R
.
.
45 Nm (4.5 m
•
kg, 32 ft
•
Ib)
T
R
.
.
20 Nm (2.0 m
•
kg, 14 ft
•
Ib)
T
R
.
.
17 Nm (1.7 m
•
kg, 12 ft
•
Ib)
T
R
.
.
25 Nm (2.5 m
•
kg, 18 ft
•
Ib)
T
R
.
.
12 Nm (1.2 m
•
kg, 8.7 ft
•
Ib)
5 Nm (0.5 m
•
kg, 3.6 ft
•
Ib)
T
.
R.
10 Nm (1.0 m
•
kg, 7.2 ft
•
Ib)
T
.R.