EasyManua.ls Logo

ABB ACS6000 - Page 23

ABB ACS6000
278 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 10-10 Testing the white lamp 239
Figure 10-11 Safety switch on an ARU/INU cabinet door 240
Figure 10-12 Safety switch settings 241
Figure 10-13 Four-way grounding set 242
Figure 10-14 TEU ground ball stud locations 243
Figure 10-15 ARU/INU ground ball stud locations 244
Figure 10-16 Manual output isolation overview 245
Figure 10-17 Input module A2511 246
Figure 10-18 Tools for removing the busbar connectors 247
Figure 10-19 Overview of grounding the drive - INU1 is shut
down (A) and INU2 is
shut down (B). Numbers indicate the connection
sequence. 248
Figure 10-20 Connect the grounding sets in COU1 (A and C),
TEU1 (B), INU1 (D) and INU2 (E) 249
Figure 10-21 Busbar connector removal sequence in TEU1 or
COU1 250
Figure 10-22 Fitting sequence for busbar connectors 251
Figure 10-23 Phase module removal 254
Figure 10-24 COU filter 258
Figure 10-25 Accessing the fan units in the WCU roof box 260
Figure 10-26 Air-to-air heat exchanger overview (type LT-5-5165-
UL) 261
Figure 10-27 Wire connection points on the circuit board 264
Figure 10-28 DCS800 controller - size D4 270
Figure 10-29 DCS800 controller - size D5 272
Figure 10-30 Air-to-water heat connections 275
Figure 10-31 Lift heat exchanger out of EXU cabinet 275

Table of Contents

Related product manuals