NOTE
For more information, please contact your
AMAZONE customer service.
6.4.23.4 Installing the PreTeC coulter
6.4.23.4.1 Installing the coulter
1. To move the installed coulters to the desired
position,
Loosen the bolts
.
2. Push the coulters into the desired position.
3. For telescopic coulters
Tighten the bolts to 160 Nm -180°,
or
For non-telescopic coulters
Tighten the bolts to 200 Nm.
CMS-I-00002039
Installing the coulters with a crane is described in the
following.
4. To make the coulter tip slightly towards the
front for installation,
select a longer front load handling device at the
front than at the rear.
5. Fasten the load handling device on the coulter top
link
.
6. Fasten 2 load handling devices on the coulter
body
.
CMS-I-00004137
7. Guide the tilted coulter
along the frame
.
8. Lower the coulter.
CMS-I-00004136
CMS-T-00005483-B.1
CMS-T-00005491-B.1
6 | Preparing the machine
Preparing the implement for operation
MG6660-EN-II | D.1 | 27.09.2021
148