EasyManua.ls Logo

CENNTRO LOGISTAR 100 - Page 44

Default Icon
468 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Exterior trims
30
Inspection
Schematic diagram
Steps
1. Check whether the sliding and rotating
parts of the glass lifter require lubrication.
2. Check the rollers for wear and damage.
3. Check the wire rope for damage.
Installation
Install the front glass lifter in the reverse order of removal.
! Caution
When installing glass, check whether the top of the glass is in uniform contact with the
glass chute and whether the movement up and down is stable. If the glass swings relative to
the glass chute, adjust the lifter bolts and door glass mounting screws appropriately.

Table of Contents