EasyManua.ls Logo

Cessna 182 1978 - Page 317

Cessna 182 1978
680 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MODEL
182
&
T182
SERIES
SERVICE
MANUAL
15
6
28
NOTES
Roll
pin
(28)
must
be
bonded
to
shaft
(18)
with
EA9316,
EA9309
or
EA9314.
These
products
may
be
purchased
from Hystol
Div.
Dexter
Corp.,
Willow
Pass
Rd;
Pittsburg,
CA
94565.
Equivalent
product.
EC2216,
may
be
purchased
from
3M
Co..
St.
Paul,
MN
55119.
Clean
roll
(28)
and
shaft
(18)
with
MEK,
and
thoroughly dry
parts
before
ap-
plying
bonding
agent.
At
75°F,
bond
cures
to
80%
ultimate
tensile
strength
within
24
hours.
Accel-
erated
cure
times
are
as
follows:
(a)
Five
minutes
at
250°F
(b)
Ten
minutes
at
200°F.
Before
installing
screw
(26)
on
drive
shaft
(18),
clean
threads
of
screw
(26)
with
MEK
or
equiva-
lent.
After
threads
have
thoroughly
dried,
apply
Grade
CV
Loctite
Catalog
85
or
83,
Loctite 242,
or
equivalent.
Loctite
products
may
be
obtained
from:
Loctite
Corp.,
705
Mountain
Rd,
Newington.
CT
06111.
Figure
12-7.
Fuel
Selector
Valve
and
Controls
(Sheet
3
of
3)
12-21

Table of Contents

Cessna 182 1978 - Page 317