Transport carriage
Service Instructions 745-35-10 S/745-35-10 A - 02.0 - 04/2017 81
Fig. 68: Changing the toothed belt (3)
5. Loosen the screws (7) (3 pcs) slightly.
6. Loosen the clamping screw (6).
 The belt tension decreases.
7. Swivel the belt clamp (1) by 90° and remove the screws (8) of the belt 
clamping pieces (9).
8. Remove the toothed belt from the machine.
Insert the new toothed belt
(piece goods, minimum length 1.45 meters)
To insert a new toothed belt:
1. Insert the new toothed belt through the frame bar, making sure it runs 
over both belt pulleys.
2. Fasten the loose ends of the toothed belt on the belt clamp (1) using 
the belt clamping pieces (9).
3. Position the belt clamp (1) above the carriage and assemble it using 
the screws of the belt clamp.
4. Set the toothed belt tension ( p. 82).
(6) - Clamping screw
(7) - Screws
(8) - Screws
(9) - Belt clamping pieces