Transport clamps
Service Instructions 745-35-10 S/745-35-10 A - 02.0 - 04/2017 95
4. Start the loading process.
Repeatedly press the left pedal until the piping strip is fed and the 
folding plates are closed.
5. Loosen the clamping screws (4) and adjust the blast pipes in the folding 
plates by turning.
6. Adjust the blown air pressure at the throttle valve (5).
If necessary, undo the loading process by pressing back the left pedal 
until the clamping screws (4) are accessible.
7. Tighten the clamping screws (4).
8. Repeatedly press the left pedal until the pocket bag is fed and the flap 
clamp is closed.
9. Loosen the screws and adjust the blast pipes in the flap clamps (3) by 
turning.
10. Adjust the compressed air at the throttle valve (5).
11. Tighten the screws.
12. Press the left pedal.
 The sewing process starts.
13. Check the feeding process.