EasyManua.ls Logo

Edwards GXS Series

Edwards GXS Series
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Check that all the connecons are secure, ghten any loose connecons. Inspect
all cables, pipelines, hoses and connecons and check that they are not corroded
or damaged and do not leak, repair or replace any pipelines, hoses and
connecons that are corroded or damaged, or which leak.
3. Ret the enclosure side and top panels.
For the areas with hard water or sites with the poor cooling water quality it may be
necessary to clean the cooling water pipes to prevent blockages and reducons in
cooling eciency. The equipment and chemicals for pipe cleaning are commercially
available. Contact us for more informaon.
5.5 Overhaul
WARNING:
Do not aempt to overhaul the pump without our training and tooling.
We provide a full range of overhaul opons worldwide. We can provide training, tooling
and spares to enable the users to overhaul their pumping systems. Contact us for more
informaon.
Page 73
M58800880_H - Maintenance

Table of Contents

Related product manuals