EasyManua.ls Logo

Epson ES Series - 9.1 Replacing the Ball Screw Spline Unit

Epson ES Series
236 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8. Replacing the Timing Belts Part 2: Maintenance
156
8.1 Replacing the Z belt
Removal : Z belt
(1) Remove the Joint #3 motor unit as described in 5.3 Replacing the Joint #3 Motor steps
(1) through (4).
(2) Remove the bolts (3-M4×10) from the spline plate.
M4×10
Spline plate
(3) Lift the spline plate and draw the Z belt up, make it through under the spline plate, and
pull the Z belt upward.
Z belt

Table of Contents

Related product manuals