Versiv Series Cabling Certification Product Family
Technical Reference Handbook
520
Step 3: Set up Tests for the Project
A project includes the tests and settings for the tests that are
necessary for a job. If you do not specify settings for a test, the
tester uses the default settings.
For this tutorial, your project will include tests for twisted pair
cable and fiber optic cable. It is not necessary to attach a copper
or fiber module before you set up a test for that module.
To set up a twisted pair test for the project
3-1 On the PROJECT screen, tap NEW TEST.
3-2. If the TEST SETUP screen does not show DSX-8000 or
DSX-5000, tap Module.
If a module is not attached, the MODULE screen shows.
On the MODULE screen, tap the correct DSX CableAnalyzer
module.
3-3. On the TEST SETUP screen, select and change the test
settings as necessary for a test on twisted pair cable. For
information about twisted pair test settings, see “Settings
for Twisted Pair Tests” on page 84.
3-4. When you have completed your selections for the twisted
pair cable test, tap SAVE on the TEST SETUP screen.
To set up a fiber loss/length test for the project
3-5. On the PROJECT screen, tap NEW TEST.
3-6. If the TEST SETUP screen does not show a CertiFiber Pro
module, tap Module.
If a module is not attached, the MODULE screen shows.
On the MODULE screen, tap a CertiFIber Pro module.