EasyManua.ls Logo

Fluke DSX-8000 - Page 93

Fluke DSX-8000
700 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2: Get Started
Tutorial: Do a Bi-directional SmartLoop Test
57
GPU199.EPS
Figure 17. SET LAUNCH COMP Screen for the SmartLoop Test
The distances shown are relative to the end of the launch cord,
which is at 0.00 m.
The loopback cord is 105.07 m long, so the tail cord starts at
105.07 m. The length of the loopback cord plus the tail cord is
208.75 m.
The launch cord is 103.74 m long, so the OTDR port shows at
-103.74 m.
If you set up the launch compensation when connected to a link,
you can tap the Launch and Tail buttons if necessary to select
the correct locations for the ends of the launch and tail cords.
D
B
E
A
A
C

Table of Contents

Related product manuals