6.3.1 Installing expansion cards
6.3.1.1 Preliminary steps
Perform the following procedures:
Ê "Disabling SVOM boot watchdog functionality" on page 54
Ê Locate the desired server node with the ID button.
Ê "Shutting down the server node" on page 39
Ê "Removing the server node from the server enclosure" on page 40
Ê "Removing the riser module" on page 41
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver