EasyManua.ls Logo

Fujitsu PRIMERGY CX2550 M1 - Installing Expansion Cards; Preliminary Steps

Fujitsu PRIMERGY CX2550 M1
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
108 Upgrade and Maintenance Manual CX2550 M1
Expansion cards
6.3.1 Installing expansion cards
6.3.1.1 Preliminary steps
Perform the following procedures:
Ê "Disabling SVOM boot watchdog functionality" on page 54
Ê Locate the desired server node with the ID button.
Ê "Shutting down the server node" on page 39
Ê "Removing the server node from the server enclosure" on page 40
Ê "Removing the riser module" on page 41
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M1

Related product manuals