EasyManua.ls Logo

Fujitsu PRIMERGY CX2550 M1 - USB Flash Module (UFM); Installing the UFM Board; Required Tools; Preliminary Steps

Fujitsu PRIMERGY CX2550 M1
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
164 Upgrade and Maintenance Manual CX2550 M1
System board and components
9.3 USB Flash Module (UFM)
The server node can be equipped with a USB Flash Module (UFM).
9.3.1 Installing the UFM board
9.3.1.1 Required tools
Preliminary and concluding steps: tool-less
Main steps:
Phillips PH1 / (+) No. 1 screw driver
9.3.1.2 Preliminary steps
Perform the following procedures:
Ê "Disabling SVOM boot watchdog functionality" on page 54
Ê Locate the desired server with the ID button.
Ê "Shutting down the server node" on page 39
Ê If applicable, remove all external cables from the server node.
Ê "Removing the server node from the server enclosure" on page 40
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: Preliminary and concluding steps: tool-less
Main steps:
Phillips PH1 / (+) No. 1 screw driver

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M1

Related product manuals