80 Upgrade and Maintenance Manual CX2550 M1
Basic software procedures
5.2.13 Performing a RAID array rebuild
After replacing a hard disk drive that has been combined into a RAID array,
RAID rebuild will be performed completely unattended as a background
process.
Ê Ensure that the RAID array rebuild has started normally. Wait until the
progress bar has reached at least one percent.
Ê Inform the customer about the remaining rebuild time, based on the
displayed duration estimate.
Figure 15: Progress bar (RAID array rebuild)
V CAUTION!
The system is now operational, however, data redundancy will not be
available until the RAID array rebuild is complete. Depending on the hard
disk drive capacity the overall process can take up to several hours, in
some cases even days.
I You may notice a slight performance impact during rebuild.
5.2.14 Looking up changed MAC / WWN addresses
When replacing a network controller, the MAC (Media Access Control) and
WWN (World Wide Name) addresses will change.
I In addition to the procedures described below, MAC / WWN addresses
can also be found on the type label attached to a network controller or
system board.
5.2.14.1 Looking up MAC addresses
Ê Enter the ServerView iRMC web frontend.
Ê Select the System Information menu.

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY CX2550 M1 and is the answer not in the manual?

Fujitsu PRIMERGY CX2550 M1 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY CX2550 M1
CategoryServer
LanguageEnglish

Related product manuals