9.3.2.3 Concluding steps
Perform the following procedures:
Ê "Installing the server node in the server enclosure" on page 50
Ê If applicable, reconnect all external cables.
Ê "Controls and indicators on the server node" on page 51
Ê "Enabling SVOM boot watchdog functionality" on page 72
9.3.3 Replacing the UFM board
9.3.3.1 Preliminary steps
Perform the following procedures:
Ê "Disabling SVOM boot watchdog functionality" on page 54
Ê Locate the desired server with the ID button.
Ê "Shutting down the server node" on page 39
Ê If applicable, remove all external cables from the server node.
Ê "Removing the server node from the server enclosure" on page 40
9.3.3.2 Removing the UFM
Ê Remove the UFM as described in section "Removing the UFM board" on
page 170.
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: tool-less
– combination pliers and flat nose pliers
– Phillips PH1 / (+) No. 1 screw driver