System board and components
9.3.2.3 Concluding steps
Perform the following procedures:
Ê "Installing the server node in the server enclosure" on page 50
Ê If applicable, reconnect all external cables.
Ê "Controls and indicators on the server node" on page 51
Ê "Enabling SVOM boot watchdog functionality" on page 72
9.3.3 Replacing the UFM board
9.3.3.1 Preliminary steps
Perform the following procedures:
Ê "Disabling SVOM boot watchdog functionality" on page 54
Ê Locate the desired server with the ID button.
Ê "Shutting down the server node" on page 39
Ê If applicable, remove all external cables from the server node.
Ê "Removing the server node from the server enclosure" on page 40
9.3.3.2 Removing the UFM
Ê Remove the UFM as described in section "Removing the UFM board" on
page 170.
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: tool-less
combination pliers and flat nose pliers
Phillips PH1 / (+) No. 1 screw driver

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY CX2550 M1 and is the answer not in the manual?

Fujitsu PRIMERGY CX2550 M1 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY CX2550 M1
CategoryServer
LanguageEnglish

Related product manuals